|
|
 |
|
 |
 |
 |
 |
| |
|
| |
 |
| |
|
| |
The first berth of Tobishima Pier South Side Container Terminal was put into operation in December 2005. Starting in December 2008 it has been used as a continuous berth together with Berth No. 2.
This terminal was developed with collective efforts by both the public and private sectors, as a designated international container terminal playing a key role in the Super Core Port Project, in which the Port of Nagoya was included in July 2004.
The 16-meeter deep berth is equipped with six super post-panamax gantry cranes capable of handling 22 rows of boxes on deck; thus, it can accommodate larger containerships to be deployed in the near future.
Automated cargo-handling systems such as remote control/automatic rubber tired transfer crane (RTG) and Automated Guided Vehicles (AGV) will be introduced in terminal operations, and high quality service at low cost will be provided following the construction of an IT/Automated Terminal , and to expand the container volume.
These 2 berths have an earthquake resistant design to ensure international container distribution functions in the event of disasters.
|
|
| |
|
| |
 |
| |
Tobishima Pier South Side Container Terminal |
| |
 |
| |
|
| |
|
| |
|
| |
 |
| |
|
| |
| |
Berth No.1(TS2) |
Berth No.2(TS1) |
| Berth(quake-resistant) Length |
400m |
350m+(adjacent part 35m) |
| Water Depth |
16m |
Terminal Area
(Including quay and apron) |
233,979m2 |
127,570m2 |
| Yard Capacity |
(Transfer Crane Yard) |
9,768 TEU( 4-high stack) |
7,920 TEU(4-high stack) |
| (Inspection Yard,etc) |
Customs・Plant Quarantine(392TEU),Dangerous Cargo(32TEU),Reefer Container(162TEU) |
| Reefer Plugs |
240 |
| Gate House |
Number of Lanes
|
6 Lanes Inward, 6 Lanes Outward |
| Truck Scales |
1(50 t) |
| Gantry Cranes |
Number of Cranes |
3(quake-absorbing) |
3(quake-absorbing) |
| Rated Capacity |
45.0 t |
45.0 t |
| Hoisting Load |
65.0 t |
65.0 t |
| Outreach |
59.0m(6 tires in 22 rows) |
59.0m(6 tires in 22 rows) |
| Rail Span |
30.5m |
30.5m |
Transfar Cranes(RTG) |
24 |
| AGV |
- |
20 |
| Lessee, Terminal operator |
Tobishima Container Barth Co., Ltd.(TCB) |
(Investing Companies) Kwasaki Kisen Kaisha, Ltd. / Mitsui O.S.K. Lines, Ltd. / Nippon Yusen Kaisha / Asahi Unyu Kaisha, Ltd. / Isewan Terminal Service Co., Ltd. / Kamigumi Co., Ltd. /
Tokai Kyowa Co., Ltd. / Fujitrans Corporation / Meiko Trans Co., Ltd. / Tobishima Logistics Service, Inc. |
| Service Routes |
North America / Europe |
|
|
| |
–Facilities are
to be constructed through coordination with lessees. |
|